Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Use Insulation Mat as required
Gain access to PCB
Selector switch set to CH/DHW position
Boiler DHW thermostat set to MAX
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the fan to run and the ignition sequence to commence.
Measure the AC voltage between pin 1 (blue) and
pin 2 (brown) on connector CN5 during the ignition phase.
Expect mains voltage.
Note:
The appliance may go to lockout, reset as required until the test is complete.