Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Selector switch set to CH/DHW position
Boiler CH thermostat set to MAX
Remove right hand side panel
Attach temperature clamp to flow pipe as indicated by the red arrow
Boiler CH thermostat set to MAX
Remove right hand side panel
Attach temperature clamp to flow pipe as indicated by the red arrow
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow the burner to ignite and heat up the system until MAX temperature is reached.
Monitor the appliance temperature.
Note:
To reduce the time for this test the heating load can be reduced
by turning off some radiators temporarily.
Monitor the appliance temperature.
Note:
To reduce the time for this test the heating load can be reduced
by turning off some radiators temporarily.