Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove both leads from the DHW flow switch
Measurement:
Measure the resistance between the terminals on the flow switch.
Expected resistance open circuit.
Run a hot tap at 2 litres/min and repeat the above test.
Expected resistance short circuit.
Expected resistance open circuit.
Run a hot tap at 2 litres/min and repeat the above test.
Expected resistance short circuit.

Isolate as per TOPs P4
and refit as necessary