Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove connector CN9 from the PCB
Measurement:
Measure the resistance between pin 7 (purple)
and pin 8 (purple) on connector CN9.
Expected resistance open circuit.
Run a hot tap at 2 litres/min and repeat the above test.
Expected resistance short circuit.
and pin 8 (purple) on connector CN9.
Expected resistance open circuit.
Run a hot tap at 2 litres/min and repeat the above test.
Expected resistance short circuit.

Isolate as per TOPs P4
and refit as necessary