Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
CH temperature control to max
Selector switch set to ch/dhw
Selector switch set to ch/dhw
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the boiler to run for 5 minutes with the central heating demand.
Remove CH demand.
Does the pump continue to run for approximately 30 seconds?
Remove CH demand.
Does the pump continue to run for approximately 30 seconds?
Isolate as per TOPs P4
and refit as necessary