Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Dhw temperature control to max
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the boiler to commence its ignition sequence
(fan running).
After approx 3 seconds measure for mains voltage
across connections blue (neutral) connector
CN1 and top connection CN7-3 as illustrated.
Expected voltage; Mains voltage.
Note.
Lockout may occur after one attempt to ignite. Reset boiler as required until test completed.