Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Close flow and return isolation valves
Discharge primary system water

Observation:

Confirm the expansion vessel charge pressure is correct
(valve location top rear center).
Expected pressure between 0.7- 0.8 bar.