Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
CH Demand
Hinge down the PCB
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Ensure all external controls are calling.
Measure for ac voltage across the two black terminals on terminal block (ME) as illustrated. (two connections left-hand side).
Expected voltage should be 0 volts.