Set Appliance State:
Mains Power Off
Mode selector switch to Off/Reset position
Use insulation mat as necessary
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between live, connection 5 (brown wire) and neutral, connection 7 (blue wire) at connector M16 on the main PCB.
Note:
Connections are numbered top to bottom.
Note:
Connections are numbered top to bottom.

Isolate as per TOPs P4
and refit as necessary