Set Appliance State:
Mains Power Off
CH Demand
Summer/Winter Switch set to Winter.
Room stat at Min.
Timed/Constant Switch to Constant.
Room stat at Min.
Timed/Constant Switch to Constant.
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
1. Measure voltage on pin 4.
Mains should be absent.
2.Turn room stat to Max.
There should be Mains present on pin 4.
Mains should be absent.
2.Turn room stat to Max.
There should be Mains present on pin 4.

Isolate as per TOPs P4
and refit as necessary