Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Voltage Set meter to measure AC Volts
Turn Hot Water Tap On
Replace Air Chamber Cover.
Summer/Winter Switch set to Summer.
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure voltage across the operator, (blue (com) and brown (+ve) wires).