Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Disconnect 24V external control wiring and make safe
Link out 24V external controls with a wire link
Link out 24V external controls with a wire link
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
With the 24V external controls bypassed does the
boiler respond to a CH demand?
Note.
If boiler still does not respond leave external controls linked out.
boiler respond to a CH demand?
Note.
If boiler still does not respond leave external controls linked out.
Isolate as per TOPs P4
and refit as necessary