Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Appliance primary circuit drained and discharged
Measurement:
The Schrader valve is located on the top of
the boiler on the right hand side.
Ensure the expansion vessel has the correct amount of charge.
Expected charge should be approximately 1 bar.
the boiler on the right hand side.
Ensure the expansion vessel has the correct amount of charge.
Expected charge should be approximately 1 bar.