Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Use Insulation Mat as required
Remove the PCB Cover
Remove the PCB Cover
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Carry out a check for mains voltage on the Live and Neutral connections on the supply side of the main terminal strip.

Isolate as per TOPs P4
and refit as necessary