Set Appliance State:
Mains Power Off
CH Demand
Heating Temperature Control to Maximum
Gas On
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
Operate the boiler in CH mode allowing it to obtain a satisfactory operating temperature.
Remove the CH demand.
Does the pump overrun for approximately 3 minutes?
Remove the CH demand.
Does the pump overrun for approximately 3 minutes?
Isolate as per TOPs P4
and refit as necessary