Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Disconnect 24V external control wiring (marked 'OT') and make safe
Link out 24V external controls with a wire link (marked 'OT')
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the 4 minute pump purge to complete.
With the 24V external controls bypassed does the
boiler respond to a CH demand ?