Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Disconnect EBUS wiring and make safe
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the 4 minute pump purge to complete.
With the EBUS external controls disconnected does
the boiler respond to a CH demand?