Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow the 4 minute pump purge to complete.
Measure the AC voltage between pin 2 (black)
and pin 3 (blue) on connector X3.
Expect mains voltage.
Note.
Place the probes in the small holes on the PCB.
Measure the AC voltage between pin 2 (black)
and pin 3 (blue) on connector X3.
Expect mains voltage.
Note.
Place the probes in the small holes on the PCB.

Isolate as per TOPs P4
and refit as necessary