Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow 3 minute self check to complete.
As appliance begins the sparking stage of the ignition sequence measure the voltage between the White and Blue wires on X1.
Approx 210V DC should be present.
Note:
Boiler will attempt ignition 5 times before going to lockout.
Reset appliance as necessary (self check will restart).