Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Remove fan connector from fan assembly and make safe
Remove fan connector from fan assembly and make safe
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset E8 fault code if still shown.
3 minutes after power is reinstated or 3 minutes after E8 fault code has been reset measure the voltage between the green wire on X8 to a suitable earth point.
Approximately 28 vdc should be measured.
Is the voltage measured as expected?
Note:
Voltage will only be present for approximately 1 minute as the PCB attempts
to run the fan before lockout (i.e. voltage present between 3 and 4 minutes
after power is reinstated / E8 fault code has been reset).
Although this test is time consuming, repeat test
as necessary until outcome is determined.
3 minutes after power is reinstated or 3 minutes after E8 fault code has been reset measure the voltage between the green wire on X8 to a suitable earth point.
Approximately 28 vdc should be measured.
Is the voltage measured as expected?
Note:
Voltage will only be present for approximately 1 minute as the PCB attempts
to run the fan before lockout (i.e. voltage present between 3 and 4 minutes
after power is reinstated / E8 fault code has been reset).
Although this test is time consuming, repeat test
as necessary until outcome is determined.

Isolate as per TOPs P4
and refit as necessary