Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the AC voltage between the two outer pins on the 7 way connector (orange and blue)
Expect mains voltage.
Is the voltage measured as expected?
Expect mains voltage.
Is the voltage measured as expected?

Isolate as per TOPs P4
and refit as necessary