Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset lockout as necessary.
Allow ignition sequence to commence and sparking heard.
Measure the DC voltage between pin 3 (black) and pin 5 (red) on the 6 pin connector.
Expect approximately 215V DC.
Is the voltage measured as expected?
Allow ignition sequence to commence and sparking heard.
Measure the DC voltage between pin 3 (black) and pin 5 (red) on the 6 pin connector.
Expect approximately 215V DC.
Is the voltage measured as expected?

Isolate as per TOPs P4
and refit as necessary