Set Appliance State:
Mains Power Off
CH Demand
Summer/Winter switch set to WINTER (switch pressed in)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
While the appliance has a CH demand monitor the pump.
The pump should run once the demand has been recognised (this may take up to 15 seconds)
How does the pump behave?
The pump should run once the demand has been recognised (this may take up to 15 seconds)
How does the pump behave?