Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Selector switch to DHW position
CH temperature selector to minimum
DHW Preheat selector to OFF position
CH temperature selector to minimum
DHW Preheat selector to OFF position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow fan to run and ignition sequence to commence.
After approximately five seconds, measure the voltage at connection 2 (blue lead) and connection 4 (brown lead) at connector A1 on the PCB.
Voltage will only be present for approximately 10 seconds. As burner will not ignite, boiler may go to lockout.
After approximately five seconds, measure the voltage at connection 2 (blue lead) and connection 4 (brown lead) at connector A1 on the PCB.
Voltage will only be present for approximately 10 seconds. As burner will not ignite, boiler may go to lockout.

Isolate as per TOPs P4
and refit as necessary