Set Appliance State:
Mains Power Off
CH Demand
ON/OFF Switch ON
CH Temp Selector maximum
DHW Temp Selector min
CH Temp Selector maximum
DHW Temp Selector min
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow boiler to fire and start to heat system.
Remove heating demand after approximately 1 min.
Does the pump overrun for approximately 90 seconds
Remove heating demand after approximately 1 min.
Does the pump overrun for approximately 90 seconds
Isolate as per TOPs P4
and refit as necessary