Set Appliance State:
Mains Power Off
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the boiler to ignite and run on central heating operation.
Is the heating operating satisfactorily?
While the heating reaches temperature monitor the system pressure, to do this press the radiator button (top right) twice once the burner has lit to display the system pressure, to return the display to the temperature press the return button once.
Note.
1. It may take approximately 60 seconds for the boiler to fire for CH demand.
2. It will be necessary to toggle between the system pressure and boiler temperature during the test.
Is the heating operating satisfactorily?
While the heating reaches temperature monitor the system pressure, to do this press the radiator button (top right) twice once the burner has lit to display the system pressure, to return the display to the temperature press the return button once.
Note.
1. It may take approximately 60 seconds for the boiler to fire for CH demand.
2. It will be necessary to toggle between the system pressure and boiler temperature during the test.