Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Disconnect EBUS wiring from connector X100 and make safe
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
With the EBUS external controls disconnected does
the boiler respond to a CH demand?
Note:
Ensure the wire link fitted between the 24 volt external
connections is left in place.
the boiler respond to a CH demand?
Note:
Ensure the wire link fitted between the 24 volt external
connections is left in place.
Isolate as per TOPs P4
and refit as necessary