Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove the display harness connector from the main PCB
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the DC voltage between each of the points on the main PCB listed below to the earth point on the boiler chassis.
Numbers quoted are counting downwards from the top wire on the display harness connector.
The Voltages should conform approximately to the table below:
Numbers quoted are counting downwards from the top wire on the display harness connector.
The Voltages should conform approximately to the table below:
| Test point | DC Volts | 1 | 0 |
| 2 | 4.7 |
| 3 | 21.8 |
| 4 | 5 |
| 5 | 24 |
| 6 | 5 |

Isolate as per TOPs P4
and refit as necessary