Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance Set meter to measure resistance
Disconnect the inline connector to the safety fuse harness from the main boiler harness
Remove connector from safety fuse (located top left of primary heat exchanger)

Measurement:

Measure the resistance of each of the wires in the safety fuse harness.
Expect continuity on each wire.