Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Flow and return isolation valves closed
Discharge the primary water from the boiler
Discharge the primary water from the boiler
Observation:
Confirm the expansion vessel charge is correct ?
Expected pressure should be approximately 0.75 bar
Expected pressure should be approximately 0.75 bar