Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
CH Demand
ON/OFF Switch in ON Position
CH Temp Selector in Maximum position
DHW Temp Selector in Minimum position
Mode Selector Switch in Heat and Hot water position
Remove plastic top cover from gas valve
(held by one screw top R/H corner of the cover)
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

If required reset boiler, turn CH / DHW control to reset position.
Allow Fan to run and ignition sequence to commence.
Measure the Voltage across the two black leads on the Gas Valve Operator.
(These are the two leads towards the R/H side of the Valve, not the black leads on the Modulating Solenoid).
Voltage should be approximately 20 Volts DC.