Set Appliance State:

Mains Power Off
CH Demand
Ensure there is NO flow around the heating system
i.e. turn off all radiators
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow the boiler to fire and the system to start to heat.
Is the internal by-pass tube approximately the same temperature as the flow pipe, signifying the auto by-pass valve is open?
Note:
If boiler does not have an internal by-pass fitted click HERE