Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance Set meter to measure resistance
Gain access to PCB
Use Insulation mat as required

Measurement:

Remove and inspect the air pressure
switch wiring harness for signs of
damage and test continuity.