Set Appliance State:
Mains Power Off
CH Demand
Boiler On/Off Switch ON
CH Switch ON
DHW Switch in INSTANT position
CH Switch ON
DHW Switch in INSTANT position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across terminal 4 and the neutral terminal (blue wire) marked 1Mp on the main terminal block.
Note: If a room thermostat is not fitted a link wire should connect connections 3 and 4.
Note: If a room thermostat is not fitted a link wire should connect connections 3 and 4.

Isolate as per TOPs P4
and refit as necessary