Set Appliance State:
Mains Power Off
Boiler On/Off Switch OFF
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the live terminal (brown wire) marked 2R and the neutral terminal (blue wire) marked 1Mp on the main terminal block.

Isolate as per TOPs P4
and refit as necessary