Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the burner to ignite and boiler to run in central heating mode.
Monitor the temperature of the integral bypass pipe
(indicated by the red arrow) using a temperature probe.
As the heating operates, the integral bypass should increase in temperature.
Does the temperature of the integral bypass increase during
CH operation as described?
Monitor the temperature of the integral bypass pipe
(indicated by the red arrow) using a temperature probe.
As the heating operates, the integral bypass should increase in temperature.
Does the temperature of the integral bypass increase during
CH operation as described?