Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Disconnect EBUS wiring connections and make safe
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
With the EBUS external controls disconnected does the boiler respond to a CH demand?
Note.
Ensure the wire link fitted between the 24 volt external connections is left in place.
Note.
Ensure the wire link fitted between the 24 volt external connections is left in place.
Isolate as per TOPs P4
and refit as necessary