Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Remove electrical connector to spark generator and make safe
Remove electrical connector to spark generator and make safe
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance if required.
Measure for AC voltage across pin 1 (brown lead) connector X21 and a suitable earth connection.
Expect approximately 32 vac.
Is the voltage measured as expected?
Measure for AC voltage across pin 1 (brown lead) connector X21 and a suitable earth connection.
Expect approximately 32 vac.
Is the voltage measured as expected?

Isolate as per TOPs P4
and refit as necessary