Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Drain primary system water from boiler
Remove right hand side panel if required
Remove system pressure sensor from the right hand manifold

Observation:

Inspect the system pressure sensor and manifold waterways for restrictions and/or blockages.