Set Appliance State:
Turn Hot Water Tap On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the boiler to ignite and run with the DHW demand.
A temperature rise of approximately 35°C is expected at the
flow rates as specified in the table as per the manufacturer.
However the appliance has a restrictor factory fitted which reduces the flow to:
24CXI - 8 l/min
30CXI - 10 l/min
35CXI - 12 l/min
Notes:
1. With a flow rate less than specified in the table a higher temperature rise should be produced, consider this when selecting the test outcome.
2. It may take approximately 40 seconds for the boiler to recognise
a demand, this will depend upon the boiler status. (Status code guidance CLICK HERE)
A temperature rise of approximately 35°C is expected at the
flow rates as specified in the table as per the manufacturer.
However the appliance has a restrictor factory fitted which reduces the flow to:
Notes:
1. With a flow rate less than specified in the table a higher temperature rise should be produced, consider this when selecting the test outcome.
2. It may take approximately 40 seconds for the boiler to recognise
a demand, this will depend upon the boiler status. (Status code guidance CLICK HERE)