Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
Disconnect mains voltage external control wiring, leave in a safe place
Link out external controls at X20 on the PCB (wire link)
Disconnect mains voltage external control wiring, leave in a safe place
Link out external controls at X20 on the PCB (wire link)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow self-check to complete.
Does the boiler now respond to a CH demand?
Note:
If boiler still does not respond, leave external controls
linked out for next tests, remember to re-instate any
external controls once a diagnosis has been made.
Does the boiler now respond to a CH demand?
Note:
If boiler still does not respond, leave external controls
linked out for next tests, remember to re-instate any
external controls once a diagnosis has been made.
Isolate as per TOPs P4
and refit as necessary