Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Turn Hot Water Tap On
DHW flow rate approx. 9 litres/min
Attach pressure gauge to gas valve pressure outlet test point
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow self-check to complete and boiler to ignite and establish.
After approximately 45 seconds slowly turn the DHW temperature control down.
Does the burner pressure reduce as the demand is met (modulation)?
Note:
1. At end of test return temperature control to MAX position.
2. When pressure gauge is removed the pressure test point
should be tightened and checked for gas tightness.