Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Gain access to PCB (use Insulation Mat as required)
Place PCB in test position, click HERE for guidance
Remove the flame sense lead from terminal X501
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the voltage across terminals at X501 and X500 on the PCB
Expect approx. 70 V AC.
Note:
This voltage should be present regardless of which stage the boiler is in
.