Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Gain access to PCB (use Insulation Mat as required)
Place PCB in test position, click HERE for guidance
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Reset appliance if required.
Allow the ignition sequence to commence.
Measure for mains voltage across pins 1 & 2 of PCB connector X3.
Expect mains voltage (see note).