Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Removed electrode assembly
Disconnect ignition leads from spark generator, note connections
Disconnect ignition leads from spark generator, note connections
Measurement:
Thoroughly check the spark electrodes & leads for wear, contamination, cracks, damage & spark gap is approximately 4mm.
Confirm continuity of electrodes & leads (see note).
Expected resistance continuity (zero resistance).
Notes:
1. If required clean the electrodes to ensure a good connection is made.
2. Refer to ADAPT regarding any gasket replacement requirements.
Confirm continuity of electrodes & leads (see note).
Expected resistance continuity (zero resistance).
Notes:
1. If required clean the electrodes to ensure a good connection is made.
2. Refer to ADAPT regarding any gasket replacement requirements.
