Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
If required, reset boiler.
Allow self-check to complete and ignition sequence to commence.
Measure for DC voltage across the brown and blue wires of connector 35.
Expected voltage 216 Vdc or greater (see note 3.).
Allow self-check to complete and ignition sequence to commence.
Measure for DC voltage across the brown and blue wires of connector 35.
Expected voltage 216 Vdc or greater (see note 3.).

Isolate as per TOPs P4
and refit as necessary