Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance Set meter to measure resistance
CH Demand
Disconnect inline connector to flow switch
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Confirm pump is running.
Measure for resistance across the pins of inline connector which connects to the flow switch.
Expected resistance continuity (zero resistance).