Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Gain access to PCB (use Insulation Mat as required)

Observation:

Does the boiler have an open therm device installed, connections would be to positions 1 & 2 of terminal block?
Note.
If installed terminal block will be attached to connector X21 on PCB.