Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Observation:
Does the boiler have an open therm device installed, connections would be to positions 1 & 2 of terminal block?
Note.
If installed terminal block will be attached to connector X21 on PCB.
Note.
If installed terminal block will be attached to connector X21 on PCB.