Set Appliance State:

Mains Power Off
CH Demand
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow burner to ignite and establish and boiler to operate for CH demand.
Once the boiler has reached a reasonable temperature switch off the demand, the fan should overrun for approximately 4 minutes.