Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to the boilers main terminal strip (use insulation mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between terminal marked "SL 1"
to the "MAINS IN" N connection at the terminal strip.
Mains voltage should be present.
to the "MAINS IN" N connection at the terminal strip.
Mains voltage should be present.

Isolate as per TOPs P4
and refit as necessary